Today Sunday

CLASSIFIEDS



Public Notice Classifications

Public NoticesPublic Notices

Show Ads from Today Miscellaneous

NOTICE OF INVITATION TO PUBLIC BID Lompoc Oncology Pharmacy Redesign (OSHPD 3) Project location: 1213 E. Ocean Ave., Lompoc CA Wages: Prevailing wage Pre-Bid Conference: Mandatory job walk-through, Noon, Feb. 1, 2019 General Description: Set-up temporary compounding suite per USP 797/800 specs. Demo and remodel existing compounding area per plan and specs. OSHPD 3. Plans available at: The Santa Maria Valley Contractors Association plan room, at smvca.org or call 805-315-6506 for a printed version. Sealed paper Bids must be received at or before 2 p.m. Feb. 26, 2019 at the LVMC board room located at 1515 E. Ocean Ave., Lompoc Ca. 93436. All bids will be opened and posted promptly. The low bidder will then be subject to LVMC board approval. Address bids to: Lompoc Valley Medical Center c/o Facility Engineer Brad Jones/Facilities Maintenance 1515 E. Ocean Ave. Lompoc CA 93436 Jan. 20, 27/2019--54437
01-NOTICE TO CONTRACTORS CALLING FOR BIDS 1. OWNER: Montecito Union School District 2. PROJECT IDENTIFICATION NAME: 1819-1 North Parking Lot and Play Area Access Project 3. PROJECT LOCATION: 385 San Ysidro Road, Santa Barbara, CA 93108 4. PROJECT DESCRIPTION: 1. Installation of a new accessible path of travel connecting to existing path of travel. 2. Construction of three wood and steel ball walls. 3. Replacement and expansion of the existing North Parking Lot. This project is anticipated to start on approximately June 7, 2019 and completion on around August 9, 2019 5. BID DEADLINE: Bids are due on February 22, 2019 at 10:00 a.m. 6. PLACE AND METHOD OF BID RECEIPT: All Bids must be sealed. Personal delivery, courier, or mailed via United States Postal Service and addressed to Montecito Union School District, 385 San Ysidro Road, Santa Barbara, CA 93108. ATTN: Virginia Alvarez 7. PLACE PLANS ARE ON FILE: Montecito Union School District, Business Department, Second Floor, 385 San Ysidro Road, Santa Barbara, CA 93108 The active link for the drawings and other related bid support documents is available at www.montecitou.org and documents are also available for download at: https://www.dropbox.com/sh/46g3tse0hvmiwkc/AAClT5fHvTyqzy-ljnocrlbDa?dl=0 8. ALTERNATES: If alternate bids are called for, the contract will be awarded to the lowest bid price on the base contract without consideration of the prices on the additive or deductive items. 9. MANDATORY JOB WALK: Meet at Montecito Union School Office on January 30, 2019 at 9 a.m. Attendance at the entire job walk is mandatory and failure to attend the entire job walk may result in your bid being rejected as non-responsive. Contact OWNER for details on required job walks and related documentation. 10. This is a prevailing wage project. OWNER has ascertained the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute this contract. These rates are on file at OWNERs office, and a copy may be obtained upon request, or at www.dir.ca.gov. Contractor shall post a copy of these rates at the job site. ALL PROJECTS OVER $1,000 ARE SUBJECT TO PREVAILING WAGE MONITORING AND ENFORCEMENT BY THE LABOR COMMISSIONER. It shall be mandatory upon the contractor to whom the contract is awarded (CONTRACTOR), and upon any SUBCONTRACTOR, to pay not less than the specified rates to all workers employed by them in the execution of the contract. 11. A Payment Bond for contracts over $25,000 and a Performance Bond for all contracts will be required prior to commencement of work. These bonds shall be in the amounts and form called for in the Contract Documents. 12. Pursuant to the provisions of Public Contract Code Section 22300, CONTRACTOR may substitute certain securities for any funds withheld by OWNER to ensure CONTRACTORs performance under the contract. At the request and expense of CONTRACTOR, securities equivalent to any amount withheld shall be deposited, at the discretion of OWNER, with either OWNER or a state or federally chartered bank as the escrow agent, who shall then pay any funds otherwise subject to retention to CONTRACTOR. Upon satisfactory completion of the contract, the securities shall be returned to CONTRACTOR. Securities eligible for investment shall include those listed in Government Code Section 16430, bank and savings and loan certificates of deposit, interest bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by CONTRACTOR and OWNER. CONTRACTOR shall be the beneficial owner of any securities substituted for funds withheld and shall receive any interest on them. The escrow agreement shall be in the form indicated in the Contract Documents. 13. To bid on or perform the work stated in this Notice, CONTRACTOR must possess a valid and active contractor's license of the following classification(s) B No CONTRACTOR or subcontractor shall be qualified to bid on, be listed in a bid proposal, subject to the requirements of ¤ 4104 of the Public Contract Code, for a public works project (submitted on or after March 1, 2015) unless currently registered with the Department of Industrial Relations (DIR) and qualified to perform public work pursuant to Labor Code ¤ 1725.5. No CONTRACTOR or subcontractor may be awarded a contract for public work on a public works project (awarded after April 1, 2015) unless registered with the DIR. DIRs web registration portal is: www.dir.ca.gov/Public-Works/Contractors.html 14. CONTRACTOR and all subcontractors must furnish electronic certified payroll records (eCPR) to the Labor Commissioner monthly in PDF format. Registration at www.dir.ca.gov/Public-Works/Certified-Payroll-Reporting.html is required to use the eCPR system. The following notice is given as required by Labor Code Section1771.5(b)(1): CONTRACTOR and any subcontractors are required to review and comply with the provisions of the California Labor Code, Part7, Chapter1, beginning with Section1720, as more fully discussed in the Contract Documents. These sections contain specific requirements concerning, for example, determination and payment of prevailing wages, retention, inspection, and auditing payroll records, use of apprentices, payment of overtime compensation, securing workers compensation insurance, and various criminal penalties or fines which may be imposed for violations of the requirements of the chapter. Submission of a bid constitutes CONTRACTORs representation that CONTRACTOR has thoroughly reviewed these requirements. 15. OWNER will retain 5% of the amount of any progress payments. 16. This Project does not require prequalification pursuant to AB1565 of all general contractors and all mechanical, electrical and plumbing subcontractors Advertisement Dates: January 20, 22, 27, 2019 - Virginia Alvarez 805-969-3249 Jaanuary 20, 22, 27/2019-54441